1
|
|
|
2
|
- Partition in airplane
- (also known as bulkhead)
- Set-up, preparation, and run time of one partition was timed at 96
minutes
|
|
3
|
- Decrease potential for quality error
- Reduce set-up and preparation time
- Simplify operating procedures
- Reduce cycle time
|
|
4
|
- Excessive time spent on the following:
- Placing plastic on the partition material
- Taping the partition to the table
- Too many programmed tools changes
- Unnecessary cutting of a test pocket
- Slow cutting speeds
- Too many cutting passes on various pockets
|
|
5
|
- Fabricated a template to place on top of partition material to replace
the plastic
- Changed programming along the profile to stabilize scrap and eliminate
need for taping parts to machine
- Eliminated 28 tool changes
- Increased feed speed 4X
- Eliminated test cut
|
|
6
|
- Reduced set-up, preparation, and run time of one partition from 96
minutes to
- 28
minutes
- Increased productivity by
- 71 %
|