- Assembly Process Improvement
- and
- Roto-Mould Quick Changeover Reduction
|
|
2
|
|
|
3
|
- Square feet utilized in process
- Distance travelled to pack units
- Time required per unit
- 41% productivity increase
- Non-value adding activities
|
|
4
|
- Before:
- Mould changeover took 7 minutes
- Spider stabilized with safety jackets
- Operator laid on back between spiders to tighten hold-down bolts
- Measuring hoop used to ensure mould clearance in furnace
|
|
5
|
- After:
- Reduced mould changeover to 61 seconds
- Eliminated spider jacks
- Eliminated operator lying between spiders
- Eliminated need for hooping process
|