"Increase Your
Productivity and Quality
While Reducing Your
Lead Times and Inventories"

Your operation can benefit from Quick Changeover techniques if you are experiencing any of the following problems:

  • Frequent schedule changes causing excessive set-up costs
  • Unacceptable delivery, lead times, and customer satisfaction
  • Excessive in-house manufacturing cycle times causing the sales forecast horizon to be too far in the future to be reliable
  • Inability to produce small customer orders without charging for set-ups
  • Exorbitant raw material and work-in-process inventories
  • Wasted floor space to store WIP inventories
  • Justifying funds to rent/buy additional warehouse space, racks, lift trucks and indirect labour

 

 
 
Results
In many organizations, the reduction of set-up can be the key to improved productivity, customer service, and inventory reduction. We have helped numerous clients achieve dramatic reductions in areas such as:
  • W.I.P. Inventory
  • Factory lead times
  • Factory floor space requirements

Set-up Reduction
Examples

6 High Cold Rolling Mill
86%
110 Ton Verson Press
97%
Resistance Welding M/c
100%
Printing Press
81%
Forging Press
68%
400-Ton Stamping Press
94%
C.N.C. Machining Centers
92%
600-Ton Coil Fed Blow Press
79%
Homag Trim and Edge Band
78%
Tube Straightening & Cut Off
84%
Injection Moulding
74%
Zinc Die Casting
71%
 

 How Quick Changeover Works

  • We train the set-up team(s) in quick set-up techniques that will enable them to reduce set-ups on any piece of equipment in your plant.
  • Our clients normally experience a minimum of 50% reductions!
     

© 2008 Lean Manufacturing Solutions Inc.
All rights reserved. LMSI™ is a registered trademark of
Lean Manufacturing Solutions Inc.
© 2008 Lean Manufacturing Solutions Inc. Tous droits réservés.
LMSI™ est une marque déposée de
Lean Manufacturing Solutions Inc.
HAMILTON ONTARIO CANADA
Telephone: 905-902-2367
info@lmsi.ca